Facility - Marco Polo TLP
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
-
Development
- Platform
- Hull & Mooring
- Topsides
- Integration & Installation
-
Throughput
- Liquid Throughput
- Gas Throughput
- Infrastructure
-
Costs
- Capital Costs
- Capital Receipts
- Operating Costs
- Tariff Receipts
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Facility Map
- Participation: Table 1
- Economic analysis: Table 1
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2025)
- Throughput: Table 1
- Liquids Throughput Profile
- 3 more item(s)...
What's included
This report contains:
Other reports you may be interested in
K2
K2 is a large subsalt oil field located in southeastern Green Canyon. The K2 structure extends across several blocks, which were not ...
$3,720Genghis Khan (GC 652)
Genghis Khan (GC 652) makes up the western flank of the Shenzi structure in the southeastern corner of the Green Canyon protraction ...
$3,720Warrior South (GC 563)
Warrior South is a small oil and gas discovery located in the Green Canyon protraction area of the Central Gulf of Mexico. The field ...
$3,720