Forties System
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary
-
Key issues
- New field start-ups essential to stem declining throughput
- Potential to switch to a cost share-based system
-
Key issues
- Location maps
- Participation
-
Development
- Terminal
-
Pipelines
- Forties System
- Forties System (Brae-Forties Line)
- Onshore pipeline
- Throughput
- Third party users
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Forties System map
- Participation: Table 1
- Throughput: Table 1
- Throughput: Table 2
- Liquids throughput profile
- Development: Table 1
- Development: Table 2
What's included
This report contains:
Other reports you may be interested in
Luenen copper refinery
A detailed analysis of the Luenen copper refinery.
$2,250Brixlegg copper refinery
A detailed analysis of the Brixlegg copper refinery.
$2,250Europe utility-scale energy storage pricing report 2025 - Data
This report analyses the cost of lithium-ion BESS within the European utility-scale energy storage segment.
$5,990