G/14
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- G/17d-AP platform
- Participation history
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- Area development
- G/14-A and G/14-B
- G/14-C
- G/17d-AP platform
- Infrastructure
-
Costs
-
Capital Costs
- G/14-A&B Capital Costs
- G/14-C Capital Costs
-
Operating Costs
- G/14-A&B Operating Costs
- G/14-C Operating Costs
-
Capital Costs
- 4 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Key facts: Table 1Index MapG/14-A, B & C Map
-
Participation: Table 1Geology: Table 1Well data: Table 1Reserves and resources: Table 1Production: Table 1Production: Table 2G/14- A&B Production ProfileG/14-C Production ProfileDevelopment: Table 1
- 27 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Eni G block hub
Eni operates a portfolio of offshore fields in the Dutch North Sea following its acquisition of Neptune Energy's assets. This ...
$3,720Ringhorne Øst
The Ringhorne Øst oil field is located to the north of Balder and has been developed as a satellite to the Balder and Ringhorne fields.
$3,720Port Talbot (BOF) steel plant
Tata Steel will halt its blast furnace operations by September 2024 as part of its strategic shift towards low-carbon EAF steel production.
$2,250