Gassled-Vesterled Pipeline
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
Key issues
- Norwegian State acquires ownership of the Gassled pipeline network
- Heimdal bypass project
- Study of tariff reduction impact for UK terminals
- Terminal
- Gassled
- Capital Costs
- Operating Costs
Tables and charts
This report includes the following images and tables:
-
Vesterled MapCurrent Vesterled Pipeline participationPre-Gassled Vesterled Pipeline participation
What's included
This report contains:
Other reports you may be interested in
Gassled-Vesterled Pipeline
The Vesterled pipeline system consists of the original Frigg Norwegian Pipeline and the new Vesterled link in.
$2,580Gassled-Statpipe
Statpipe was the first main gas gathering system built to take gas from fields in the Norwegian northern North Sea.
$2,580Gassled-Åsgard Transportation System
The Åsgard Transportation System (ÅTS) is a gas trunkline from the Haltenbanken fields to the processing terminal at Kårstø.
$2,580