Gassled-Oseberg Gas Transport
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
Key issues
- Norwegian State acquires ownership of the Gassled pipeline network
- Heimdal bypass project
- Oseberg gas acceleration
-
Tariffs
- Gassled
- Capital Costs
Tables and charts
This report includes the following images and tables:
-
Oseberg Gas Transport mapCurrent Oseberg Gas Transport participationPre-Gassled Oseberg Gas Transport participationOGT throughput profileOGT throughput profile
What's included
This report contains:
Other reports you may be interested in
Gassled-Norpipe Gas
Norpipe Gas was the first gas pipeline system to be constructed in the Norwegian sector.
$2,580South Sumatra-West Java Pipeline
The South Sumatra-West Java (SSWJ) gas transmission project consists of the SSWJ Phase I and SSWJ Phase II pipelines operated by PGN.
$2,580Oseberg Transportation System (OTS)
The Oseberg Transportation System (OTS) was built to transfer oil from the Oseberg field to an onshore terminal located at Sture,.
$2,580