Gassled-Oseberg Gas Transport
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Norwegian State acquires ownership of the Gassled pipeline network
- Heimdal bypass project
- Oseberg gas acceleration
- Location maps
- Participation
- Development
-
Throughput
-
Tariffs
- Gassled
-
Tariffs
-
Costs
- Capital Costs
- Operating Costs
- Fiscal and regulatory
- Economic assumptions
Tables and charts
This report includes the following images and tables:
-
Key facts: Table 1Oseberg Gas Transport mapParticipation: Table 1
-
Throughput: Table 1Throughput: Table 2OGT throughput profile
What's included
This report contains:
Other reports you may be interested in
Gassled-Åsgard Transportation System
The Åsgard Transportation System (ÅTS) is a gas trunkline from the Haltenbanken fields to the processing terminal at Kårstø.
$2,580Gassled-Vesterled Pipeline
The Vesterled pipeline system consists of the original Frigg Norwegian Pipeline and the new Vesterled link in.
$2,580Tune
The Tune gas/condensate field is located to the west of the Oseberg field complex.
$3,720