Golfinho & Canapu
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- BW Energy takes FID for the Golfinho Boost project in April 2025
- The operator plans a potential tie-back development of Camarupim to Golfinho
- BW Energy buys Golfinho and Camarupim from Petrobras divestment
- Disappointing production performance
- History
- Local content
-
Key Development Metrics
- Golfinho
- Pilot test
- Module 1
- Module 2
- Canapu
- Capital costs
- Operating costs
- Oil
- Gas
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026
-
Contingent Resources (2C) at 01/01/2026Production (2017-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2022 to 2031 (US$ million)Annual Gas Prices - GolfinhoAnnual Gas Prices - CanapuCash Flow (US$)PV Table (US$)
- 10 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Parque dos Doces
Parque dos Doces comprises the joint development of three fields located in the Espírito Santo basin, immediately to the east of ...
$3,720Penguins
Penguins is one of the most northerly fields on the UK continental shelf.It comprises a cluster of small oil, gas and condensate ...
$3,720Merian mine
A detailed analysis of the Merian gold mine project.
$2,250