Asset Report
Halfdan Area
Report summary
The Halfdan Area is one of the largest oil developments in Denmark. The main field was discovered in 1999 and was brought onstream in the same year with temporary production equipment. Full production was achieved in 2000, following the installation of a wellhead platform tied back to the Gorm and Dan facilities. Facilities have been increased progressively since then and now consist of two complexes totalling eight platforms.The oil field is partly overlain by a Danian gas reservoir, which ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Unitisation
- Geology
- Well data
-
Exploration
- Halfdan
- Igor and Sif
- Reserves and resources
-
Production
- Emissions
-
Development
-
Future developments
- Halfdan North
- HCA gas lift
- Infill drilling
-
Historical developments
- Halfdan Northeast (Sif & Igor) development
-
Future developments
- Infrastructure
-
Costs
-
Capital costs
- Halfdan Area
- Halfdan North
- Decommissioning costs
- Operating costs
-
Capital costs
- Sales contracts
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Carbon price
- Exchange rate
- Fiscal terms
- Global Economic Model (GEM) File
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 28 images and tables including:
- Key facts: Table 1
- Index map
- Halfdan Area map
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Production profile
- Infrastructure: Table 1
- Participation: Table 1
- Exploration: Table 1
- Costs: Table 4
- Costs: Table 5
- Cash flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining Present Value Price Sensitivities
- Cash flow (DKr million)
- Economic analysis: Table 5
- Economic analysis: Table 6
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
What's included
This report contains:
Other reports you may be interested in
Asset Report
Parys Mt zinc mine project
A detailed analysis of the Parys Mt zinc mine project.
$2,250
Asset Report
Tangguh (LNG)
Largest gas producing asset in Indonesia is expecting first gas from Expansion phase and will FID a CCUS-EGR facility
$5,750
Asset Report
Halilaga copper mine project
A detailed analysis of the Halilaga copper mine project.
$2,250