Hunter Gas Pipeline
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Development
-
Costs
- Operating Costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Exchange rate
- Inflation rate
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes the following images and tables:
-
Key facts: Table 1Hunter Gas Pipeline routeCosts: Table 1
-
Economic analysis: Table 1Economic analysis: Table 2Economic analysis: Table 3Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026
What's included
This report contains:
Other reports you may be interested in
Reindeer (Ceased)
The Reindeer gas field is located in the Dampier sub-basin of the Carnarvon Basin off the coast of Western Australia.
$3,720Mackenzie Valley Gas Pipeline
The Mackenzie Valley Gas Pipeline project is owned by ExxonMobil (5.33%), Shell (11.2%), ConocoPhillips (16.0%), APG (33.3%), and the ...
$2,580TurkStream
TurkStream is a 31.5 bcm (3,048 mmcfd) gas pipeline consisting of two 15.75 bcm (1,524 mmcfd) strings, linking Russia and Türkiye ...
$2,580