Intercampo Norte
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Transportation costs
- Oil
- Royalty
- Corporate income taxes
- 2013 Windfall taxes
- Cash flow
- Cash Flow
- Indicative Technical Valuations
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Field Hydrocarbon CharacteristicsDiscovery SummaryReserves (2P) at 01/01/2026Production (2015-2024)Production ProfilePipeline SummaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2033 (US$ million)
- 9 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Salares Norte mine
A detailed analysis of the Salares Norte gold mine project
$2,250Serra Norte (Northern System) iron ore mine
Vale's Carajás region first iron ore mine. Its high-grade, low-strip reserves and large scale put it at the bottom of the industry curve.
$2,250Fruta Del Norte gold mine project
A detailed production and cost competitive analysis of the Fruta Del Norte gold mine project.
$2,250