Asset Report
Jolliet/Marquette
Report summary
The Jolliet (GC 184)/Marquette (GC 52) development encompasses two small, mature oil and gas fields located in the Green Canyon protraction area of the Central Gulf of Mexico. They were co-developed with a deepwater tension-leg well platform (TLWP) located on block GC 184 with a shallow-water drilling, production and processing platform called Central Production Platform, on block GC 52. The Jolliet TLWP was the first tension-leg facility to be installed in the Gulf of Mexico.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
-
Jolliet (GC 184)
- GC 184
-
Marquette (GC 52)
- GC 52 and GC 53
- Unitisation
-
Jolliet (GC 184)
- Well data
-
Exploration
- Jolliet
- Marquette
- Reserves and resources
- Production
-
Development
- Jolliet (GC 184)
- Platform
- Subsea
- Drilling
- Marquette (GC 52)
- Platform
- Drilling
- CPP
-
Infrastructure
- Jolliet (GC 184)
- Marquette (GC 52)
- CPP
-
Costs
- Exploration and Appraisal Costs
- Capital Costs
- Operating Costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 20 images and tables including:
- Key facts: Table 1
- Index Map
- Field Map
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Production Profile
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2023
- Remaining Present Value Price Sensitivities
- Infrastructure: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
What's included
This report contains: