Asset Report

Jolliet/Marquette

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Jolliet (GC 184)/Marquette (GC 52) development encompasses two small, mature oil and gas fields located in the Green Canyon protraction area of the Central Gulf of Mexico. They were co-developed with a deepwater tension-leg well platform (TLWP) located on block GC 184 with a shallow-water drilling, production and processing platform called Central Production Platform, on block GC 52. The Jolliet TLWP was the first tension-leg facility to be installed in the Gulf of Mexico.

What's included

This report contains

  • Document

    Jolliet/Marquette

    PDF 784.95 KB

  • Document

    Jolliet/Marquette

    XLS 532.00 KB

  • Document

    Jolliet/Marquette

    ZIP 1.21 MB

Table of contents

Tables and charts

This report includes 20 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

Images

  • Index Map
  • Field Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898