L44/43, L33/43 & SW1A and L53/48
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
L44/43, L33/43 & SW1A (Phetchabun Basin fields)
- Wichian Buri (SW1A)
- Si Thep (SW1A)
- L44/43, L33/43 and SW1A concessions
- L53 concession
- Cash Flow
- L44/43, L33/43 and SW1A
- L53/48
- Indicative Technical Valuations
Tables and charts
This report includes the following images and tables:
- Index Map
- L44/43, L33/43 and SW1A Map
- L53/48 Map
- Participation
- Exploration wells
- Reserves (2P) at 01/01/2025
- Contingent Resources (2C) at 01/01/2025
- Production (2015-2024)
- L44/43, L33/43 and SW1A Production Profile
- L53 Production Profile
- Cash Flow (US$)
- PV Table (US$)
- 17 more item(s)...
What's included
This report contains:
Other reports you may be interested in
West East Gas Pipeline III
West-East Pipeline III (WEP III) is connected to line C of the Central Asia-China Gas Pipeline.
$2,580Gulfport Energy - Lower 48 upstream
Analysis of Gulfport Energy’s upstream activities in the Utica and SCOOP unconventional plays.
$22,800Big Foot (WR 29)
Big Foot (WR 29) is a subsalt Miocene oil field in the Walker Ridge protraction area, along its northern border with Green Canyon. ...
$3,720