Ledong Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Ledong 15-1/22-1
- Key development metrics
- Further details
- Yacheng 13-4/13-6
- Ledong 10-1
- Yacheng 13-1 post-PSC
- Exploration Costs
- Capital Costs
- Operating Costs
- Cash Flow
- Gas price
- Global Economic Model (GEM) file
- Cash Flow
- Ledong Area
- Yancheng 13-1 post-PSC
Tables and charts
This report includes the following images and tables:
-
Index MapLedong Area MapParticipation
-
Reserves (2P) at 01/01/2026Production (2015-2024)Production Profile - Ledong AreaProduction Profile - Yacheng 13-1 post-PSCExploration Costs 2017 to 2025 (US$ million)Capital costs - Ledong Area and Yacheng 13-1 post-PSCOperating costs - Ledong AreaOperating costs - Yacheng 13-1 post-PSC
- 17 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Enfield Area
The Enfield Area analysis includes the original Enfield Area development, and the newer Greater Enfield project.
$3,720Contract 3 Area (Ceased)
The Contract 3 Area was initially signed by Unocal in 1989 and covers a group of gas/condensate fields that have been developed on a ...
$3,720Contract 2 Area (Ceased)
The Contract 2 Area, previously known as the Unocal 2 Contract Area, covers a group of gas/condensate fields in the Gulf of Thailand, ...
$3,720