Liuhua Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Emissions
- Production Tests
-
Field Development
- Wells
- Nanhaishengli FPSO Summary
- Nanhaitiaozhan FPS Summary
- Additional details
- Subsea
- Liuhua 16-2/20-2/21-2 joint development
- Wells
- Haiyangshiyou 119 FPSO
- 2 more item(s)...
- Exploration Costs
- Capital Costs
-
Operating Costs
- Pre-2003 PSC terms
- Cash Flow
- Global Economic Model (GEM) file
- Cash Flow
- 29_04D (Liuhua 11-1)
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapBlock 29/04D MapParticipation
-
Reserves (2P) at 01/01/2026Production (2015-2024)Production Profile: Liuhua 11-1/4-1Production Profile: Liuhua 16-2/20-2/21-2Exploration Costs 2017 to 2025 (US$ million)Capital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2034 (US$ million)Liuhua 28-2 & 27-1
- 15 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Liwan
Liwan, China's first deepwater project, is located about 270 kilometres from the Guangdong province in the Pearl River Mouth Basin.
$6,900Adriana/Sabina
Adriana and Sabina are located in the Halten Terrace area of the Norwegian Sea, 25 kilometres southwest of the Skarv field.
$3,720Brutus (GC 158)
Brutus (GC 158) is an oil and gas field developed using a conventional, dry-tree tension leg platform (TLP). Development work on Brutus ...
$3,720