Logbaba
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Capital costs
-
Operating costs
- Industrial thermal gas contract
- Industrial on-site power contract
- Grid power contract
- Global Economic Model (GEM)
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapLogbaba mapCurrent participation
-
Hydrocarbon and reservoir characteristicsReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production profilePipeline summaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)
- 7 more item(s)...
What's included
This report contains: