Asset Report

Loufika-Kouakouala

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The onshore Kouakouala field lies 40 kilometres east of Congo's economic capital Pointe Noire. Production started in 2000, with output trucked to the CORAF refinery. In 2002, a 25-kilometre pipeline linking Kouakouala to the Mengo field was completed. Crude was then transported by pipeline via Mengo to the Djeno terminal for export.Eni farmed into the Kouakouala and Kouilou licences in 2007. A year later, the company completed the takeover of Burren Energy to become the sole equity ...

Table of contents

Tables and charts

This report includes 29 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Loufika and Kouakouala Map
  • Participation: Table 1
  • Participation: Table 2
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Kouakouala Production Profile
  • Loufika Production Profile
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Economic analysis: Table 1
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Economic analysis: Table 4
  • Remaining PV Price Sensitivities
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Economic analysis: Table 7
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining PV Price Sensitivities

What's included

This report contains:

  • Document

    Loufika-Kouakouala

    PDF 9.37 MB