Asset Report
Reward - Highway copper mine
Report summary
The Reward - Highway copper mine operated between 1998 and 2005 and comprised the Highway and Reward open pit copper mines, the Reward Deeps underground copper mine and exploration activities within the surrounding project tenements. Mined ore was trucked approximately 100km for processing at a conventional crushing/flotation concentrator at the Thalanga mill. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- CAPEX
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
14 April 2022
Tacuma (Boa Esperanza) copper mine project
Asset Report
Tacuma (Boa Esperanza) copper mine project
A detailed production, commercial and competitive analysis of the Tucuma copper mine project.
$2,25005 October 2022
Khoemacau (Boseto) copper mine
Asset Report
Khoemacau (Boseto) copper mine
A detailed analysis of the Khoemacau (Boseto) copper mine.
$2,25024 February 2021
La Oroya copper smelter
Asset Report
La Oroya copper smelter
A detailed analysis of the La Oroya copper smelter.
$2,250