Meranti Cluster DRO
Report summary
Table of contents
- Summary
- Key Issues
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
Tables and charts
This report includes the following images and tables:
- Index Map
- Detail Map
- Participation
- Reserves (2P) at 01/01/2025
- Production (2027-2036)
- Production Profile
- Capital Costs 2025 to Post-2033 (US$ million)
- Operating Costs 2027 to 2036 (US$ million)
- Cash flow (US$ million)
- Cash flow PV (US$ million)
- Summary Table (US$)
- 4 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Montney key play
Detailed analysis of Montney production, well design, economics, operator strategy and subsurface.
$22,800Baram Junior Cluster SFA
Located in the Baram Delta basin offshore Sarawak, the Baram Junior Cluster consists of six fields and will come onstream in 2027.
$3,720La Ventana and Rio Tunuyan
The La Ventana and Río Tunuyán licences are both located in the central Cuyo Basin, south of the Barrancas field. Both ...
$3,720