Minerva (Ceased)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Processing facilities
- Supplier Information
- Exploration Costs
- Capital Costs
- Operating Costs
- GDF Suez (now Engie)
- Santos Direct
- Uncontracted Gas
- PRRT
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapMinerva Detail MapParticipation
-
Production (2010-2019)Production ProfileExploration Costs 1993 to 2002 (US$ million)Capital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2011 to 2019 (US$ million)Engie and Santos Direct gas pricesUncontracted Gas Price AssumptionCash Flow (US$)
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Longtom (Ceased)
The Longtom field ceased production in 2015. Longtom is a gas condensate field located in the eastern Gippsland Basin.
$3,720Contract 3 Area (Ceased)
The Contract 3 Area was initially signed by Unocal in 1989 and covers a group of gas/condensate fields that have been developed on a ...
$3,720Contract 2 Area (Ceased)
The Contract 2 Area, previously known as the Unocal 2 Contract Area, covers a group of gas/condensate fields in the Gulf of Thailand, ...
$3,720