Asset Report

Minor Fields

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

These fields are all small in size end either remote from infrastructure, require expensive recovery techniques to increase production or have limited remaining recoverable reserves. The fields are all operated by private sector companies under a service contract. Petroamazonas pays a stipulated variable operating cost for base production. The majority of the production is gathered at the Lago Agrio station, where it is mixed with crude from other fields and piped to the Pacific Coast via the OCP or the SOTE pipelines.

Table of contents

    • Block 2
    • Block 45
    • Block 46
    • Block 47
    • Block 52
    • Block 53
    • Block 54
    • Block 64
    • Block 65
    • Block 66
  • Participation and reserves
  • Production

Tables and charts

This report includes 2 images and tables including:

  • Participation and reserves: Table 1
  • Production: Table 1

What's included

This report contains:

  • Document

    Minor Fields

    PDF 821.68 KB