Nevis Complex
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Apache suspends North Sea drilling
- Decommissioning will be a large, costly project
- Capital costs
- Decommissioning costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
- Nevis Central
- Cash flow (US$ million)
- Nevis Far North
- Cash flow (US$ million)
- 6 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Capital Costs Pre-2016 to 2024 (US$ million)Capital Costs 2031 to Post-2038 (US$ million)Operating Costs 2025 to 2030 (US$ million)
-
Cash Flow (US$)PV Table (US$)Summary Table (US$)Cash Flow (US$)PV Table (US$)Summary Table (US$)Cash Flow (US$)PV Table (US$)Summary Table (US$)
- 16 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Yggdrasil
The Yggdrasil project is located south of Oseberg in the Northern North Sea. The area includes 19 discoveries, some of which were ...
$3,720Oman upstream summary
Oman is the largest non-OPEC oil producer in the Middle East and has a diverse upstream industry featuring a range of oil companies.
$6,480D35-D21-J4
The D35-D21-J4 PSC was carved out of the Balingian PSC in 2014. It contains three fields offshore Sarawak, operated by PETRONAS ...
$3,720