Nevis Complex
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Apache suspends North Sea drilling
- Decommissioning will be a large, costly project
- Capital costs
- Decommissioning costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
- Nevis Central
- Cash flow (US$ million)
- Nevis Far North
- Cash flow (US$ million)
- 6 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Capital Costs Pre-2016 to 2024 (US$ million)Capital Costs 2031 to Post-2038 (US$ million)Operating Costs 2025 to 2030 (US$ million)
-
Cash Flow (US$)PV Table (US$)Summary Table (US$)Cash Flow (US$)PV Table (US$)Summary Table (US$)Cash Flow (US$)PV Table (US$)Summary Table (US$)
- 16 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Tommeliten Alpha
The Tommeliten Alpha gas and condensate field is located in the southern part of the Norwegian Continental Shelf, 25 kilometres ...
$3,720Hamburg copper smelter
A detailed analysis of the Hamburg copper smelter.
$2,250Gassled-Ekofisk Bypass (Statpipe Loop)
The Ekofisk Bypass is a gas pipeline running from the Statpipe System to the Norpipe gas pipeline.
$2,580