Asset Report

OML 112/117 (Ima)

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Find out more about our Upstream products

 Interested in this report? Explore our Upstream Oil and Gas solutions. 

Upstream products and solutions

The shallow water Ima field straddles OMLs 112 and 117 in the southeastern Niger Delta. Light oil was developed via a wellhead platform and a production unit linked by pipeline to an offshore terminal: the Ailsa Craig I floating storage and offloading (FSO) vessel. Amni International brought Ima onstream in 1997. Production peaked at over 10,500 b/d in 1998. Although production from Ima ceased in 2019, the terminal remains operational to store and export crude from Okoro and Asaramatoru ...

Table of contents

  • Summary
    • Ima Gas Field Development: FID Imminent
    • Gas development
    • Ima Gas commercial arrangements
    • Gas pricing
    • Ima oil development
    • Ima gas development
  • Ima oil capital costs
  • Ima gas capital costs
  • Ima oil operating costs
  • Ima gas operating costs
  • Cash flow
  • Global Economic Model (GEM) Files
    • Ima oil
    • Ima gas

Tables and charts

This report includes the following images and tables:

    Capital Costs Pre-2006 to 2012 (US$ million)Capital Costs 2027 to Post-2035 (US$ million)Operating Costs 2010 to 2019 (US$ million)
    Operating Costs 2029 to 2038 (US$ million)Annual Gas PricesIndex MapOML 112/117 MapIma Oil ParticipationIma Gas ParticipationHydrocarbon and Reservoir CharacteristicsE&A well dataReserves (2P) at 01/01/2026
  • 17 more item(s)...

What's included

This report contains:

  • Document

    OML 112/117 (Ima)

    PDF 3.78 MB