OML 133 (Erha)
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Find out more about our Upstream products
Interested in this report? Explore our Upstream Oil and Gas solutions.
Upstream products and solutions
Report summary
Table of contents
- Summary
- Key Issues
-
Emissions
- Tie-backs, moorings and installation
- Subsea Equipment
- Drilling
- Well Intervention
- Erha North Phase 2
- Erha North Phase 3
- Mooring chain replacement project
- Bosi
- Exploration costs
- Operating costs
- Renegotiated 1993 deepwater PSC terms
- Production bonus
- Cash Flow
- Global Economic Model (GEM) File
- Cash Flow
- Indicative Technical Valuations
Tables and charts
This report includes the following images and tables:
-
Index MapOML 133 MapOML 133 Participation
-
Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2016-2025)Oil Production ProfileErha FPSO summaryCapital Costs Pre-2017 to 2025 (US$ million)Operating Costs 2026 to 2035 (US$ million)Cash Flow (US$)
- 7 more item(s)...
What's included
This report contains: