Asset Report

OML 28 (Gbaran-Ubie)

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

  

OML 28 is an onshore block in the central Niger Delta. It is part of the NNPCL/Shell Joint Venture (JV). The block contains Gbaran-Ubie, a major integrated oil and gas project. Gas production started in 2010 and by 2011, it had reached its initial capacity of 1,050 mmcfd of gas. Gbaran-Ubie is by far the most important Nigeria LNG (NLNG) feedstock project in the JV. Phase 1 covered four fields: Gbaran, Kolo Creek, Etelebou and Zarama. They are connected to a central processing facility ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Shell agrees to sell its SPDC venture to Renaissance Africa Energy Company
      • Funding obligations
      • HP-HT subsurface conditions
      • Exploration upside
      • Militancy and theft
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Emissions
    • Phase 1
      • Gbaran CPF
      • Field facilities
    • Phase 2
      • Gbaran CPF nodal compression project
    • Phase 3
      • Uzu
    • Liquids
    • Gas
    • Capital costs
    • Operating costs
    • LNG Sales
    • Gas-to-Power
  • Fiscal and regulatory
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM)
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Gbaran-Ubie Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Gbaran-Ubie Production Profile
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Sales contracts: Table 1

What's included

This report contains:

  • Document

    OML 28 (Gbaran-Ubie)