Orca and Sul de Orca (formerly Gato do Mato)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- 
        
            Key Issues
        
        - TotalEnergies exits Orca field, increases stake in Lapa in Brazil
- Gato do Mato secures FID
- Technical challenges
- Gas development solution
- Ecopetrol increases its pre-salt presence in Brazil
 
- History
- Local content
- Reservoir
- 
        
            Gas
        
        - Key development metrics
- Facility
- Wells
 
- Oil
- Gas
- Exploration cost
- Capital costs
- 
        
            Operating costs
        
        - Transportation cost
 
- Oil
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
- Reserves (2P) at 01/01/2025
- Production (2026-2034)
- Orca Production Profile
- Sul de Orca Production Profile
- Capital Costs 2015 to 2024 (US$ million)
- Index Map
- Detail Map
- Participation
- Operating Costs 2028 to 2037 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- 13 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Brazil's pre-salt coverage overview
Brazil's pre-salt is one of the most relevant deepwater plays with a huge resource base and impressive well productivity.
$1,350Santa Cruz (LHG) iron ore mine
Santa Cruz is the largest mine of LHG Mining's complex near Corumbá. It offers a high-grade iron ore under a challenging river logistics.
$2,250Brazil's gas grid plan: which pipes pay off?
Analysis of the main projects proposed in Brazil's pipeline operators plan
$950 
         
         
         
         
         
         
     
     
     
     
     
     
     
     
    