Orca and Sul de Orca (formerly Gato do Mato)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- TotalEnergies exits Orca field, increases stake in Lapa in Brazil
- Gato do Mato secures FID
- Technical challenges
- Gas development solution
- Ecopetrol increases its pre-salt presence in Brazil
- History
- Local content
- Reservoir
-
Gas
- Key development metrics
- Facility
- Wells
- Oil
- Gas
- Exploration cost
- Capital costs
-
Operating costs
- Transportation cost
- Oil
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Reserves (2P) at 01/01/2026Production (2026-2034)
-
Orca Production ProfileSul de Orca Production ProfileCapital Costs 2015 to 2024 (US$ million)Index MapDetail MapParticipationOperating Costs 2028 to 2037 (US$ million)Cash Flow (US$)PV Table (US$)
- 13 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Sul de Sapinhoa
Sul de Sapinhoá (formerly Sul de Guará) is a pre-salt oil and gas discovery located in Brazil's Santos basin lying ...
$3,720Juiz de Fora zinc smelter
A detailed analysis of the Juiz de Fora zinc smelter.
$2,250Berbigao and Sururu
Berbigão (including Sururu after the unitisation)is a pre-salt accumulation in the Santos basin. The field originates from the Iara...
$3,720