Asset Report
Panthere-Nze (Obangue)
This report is currently unavailable
Report summary
The Panthère-Nze licence area is located onshore Gabon and contains two satellites of the large Rabi field, Obangué and Autour. Obangué was brought onstream in 1998.Addax acquired the licence in 2006 and commissioned its own export and production system. In 2009, Addax started a major development drilling campaign. A redevelopment campaign - Dinonga Phase 3 - will follow. Up to 15 wells are scheduled to be drilled across the Tsiengui, Obangué and Shell-operated Koula fields.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- Initial development
- 2016 shutdown
- Recent and future development
-
Infrastructure
- Coucal-Cap Lopez Pipeline
- Coucal-Rabi-Gamba Pipeline
-
Costs
- Exploration Costs
- Capital Costs
- Operating Costs
-
Fiscal and regulatory
- Cost Oil
-
Economic assumptions
- Discount rate and date
- Inflation rate
- Oil price
- Global Economic Model (GEM) File
- Economic analysis
Tables and charts
This report includes 23 images and tables including:
- Key facts: Table 1
- Index map
- Detail Map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Obangue production profile
- Royalty
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Infrastructure: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Profit Oil
What's included
This report contains: