Parque dos Gaviões
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- The reservoir-to-wire model
- Eneva to supply gas from Parque dos Gaviões to Suzano and Vale
- The gas market - upsides and downsides
- A new hydrocarbon basin
- Local content
- Operating costs
- Gas price
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Reserves (2P) at 01/01/2025
- Production (2013-2022)
- Production Profile
- Capital Costs 2016 to 2024 (US$ million)
- Operating Costs 2019 to 2028 (US$ million)
- Annual Gas Prices
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Ouro Prêto aluminium smelter
A detailed analysis of the Ouro Prêto aluminium smelter.
$2,250Brazil's gas grid plan: which pipes pay off?
Analysis of the main projects proposed in Brazil's pipeline operators plan
$950Parque das Conchas (BC-10)
The Parque das Conchas project (also known as the BC-10 development) is operated by Shell in the Campos basin. The project includes ...
$3,720