Pegasus West
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Post-2030 fiscal terms are uncertain
- Wider area offers material upside
- Development concept to consider low carbon solutions
- Capital costs
- Decommissioning costs
- Operating costs
- Cash flow
- GEM file name
- Cash Flow
- Cash flow (US$ million)
- Cash flow (£ million)
Tables and charts
This report includes the following images and tables:
-
Cash Flow (US$)PV Table (US$)Summary Table (US$)
-
Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining PV Price SensitivitiesCash Flow (Local Currency)PV Table (Local Currency)Summary Table (Local Currency)Index mapDetail map
- 10 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Triton Area
The Triton Area includes nine fields tied back to the Triton FPSO: Bittern, Guillemot West and North West, Clapham, Pict, Saxon, Gannet ...
$3,720Elgin Franklin Area
The Elgin and Franklin Area includes the ultra high pressure-high temperature (uHP/HT) Elgin, Franklin, West Franklin and Glenelg ...
$6,900Lancelot Area
The Lancelot Area in the Southern Gas Basin, lies 30-kilometres south of the West Sole Area. This group includes the Lancelot, ...
$3,720