PetroKazakhstan Kumkol Resources
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
-
Corporate
- Current ownership
- Historical participation changes
-
Licences
- Licence extensions
- Production licences
- Exploration licences
-
Corporate
-
Geology
-
Kumkol South
- Structure
- Reservoirs
- Hydrocarbon quality
-
Kumkol South satellites and Karabulak fields
- Structures and reservoirs
- Hydrocarbon quality
-
Kizilkiya
- Structure
- Reservoirs
-
Ariskum
- Structure
- Reservoirs
-
Maibulak
- Structure
- Reservoirs
-
Kumkol South
-
Exploration
-
Recent E&A activity
- Karaganda block
- Karavanchi block
- Doshan and Zhamansu blocks
-
Recent E&A activity
-
Reserves and resources
-
Overview
- Field unitisation
-
Oil
- In place volumes (STOIIP)
-
Gas
- Raw gas
- Sales gas
-
Overview
-
Production
- Oil
- Gas
-
Development
- Overview
- Key development metrics
-
Infrastructure
-
Oil
- Pipeline tie-ins
- Exports
- Domestic
- Current routes
- Gas
-
Oil
-
Costs
-
Capital costs
- Key considerations
-
Capital costs
-
Fiscal and regulatory
- Mineral Extraction Tax (MET)
- Liquids MET reductions
- Rent Tax on Export
- Oil Export Customs Duty (ECD)
- Corporate Income Tax
- Excess Profit Tax (EPT)
- Bonuses
- Fines and penalties
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
-
Oil price
- Export
- Domestic
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 30 images and tables including:
- Key facts: Table 1
- Index map
- PKKR fields map
- Exploration: Table 1
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2025)
- Remaining Present Value Price Sensitivities
- Production: Table 1
- Production: Table 2
- PKKR fields production profile
- PetroKazakhstan Kumkol Resources schematic
- Infrastructure: Table 1
- Participation: Table 1
- Geology: Table 1
- Geology: Table 2
- Geology: Table 3
- Geology: Table 4
- Geology: Table 5
- Geology: Table 6
- Geology: Table 7
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Costs: Table 1
- Costs: Table 2
- Operating costs
What's included
This report contains:
Other reports you may be interested in
Ember Resources AB
Ember Resources is a private operator with operations centred in the Alberta Horseshoe Canyon Coal Bed Methane (CBM) fairway.
$3,720Ramos
Ramos is one of Argentina's largest gas fields in terms of total reserves although the field is now very mature. It is located in ...
$3,720La Ventana and Rio Tunuyan
The La Ventana and Río Tunuyán licences are both located in the central Cuyo Basin, south of the Barrancas field. Both ...
$3,720