Asset Report

Pluto LNG - upstream

Get this report*

$6,900

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Pluto gas field is situated 190 kilometres offshore in the Carnarvon Basin, Western Australia. Xena is around ten kilometres southeast of Pluto. Woodside developed Pluto and Xena via a remotely controlled platform, which exports gas via a 36-inch subsea pipeline to a 4.3 mmtpa, single-train LNG plant. The Final Investment Decision (FID) was taken on 27 July 2007. The project was initially expected to come onstream in late 2010, but the first LNG cargo was not shipped until May 2012.

Table of contents

  • Summary
  • Key Issues
    • Subsea
    • Platform summary
    • Onshore
    • Downstream
    • LNG
    • Domestic gas
    • Supplier information
  • Exploration Costs
    • Historical cost
    • Xena development (2015)
    • Pluto development (2015)
    • Domgas plant, LNG trucking and Interconnector (2019)
    • Pyxis hub (2020)
    • Decommissioning
  • Operating Costs
  • LNG
  • Domestic Gas
  • Domestic gas reservation policy
  • Upstream
    • PRRT uplift on carried forward expenditures Pre- and Post- July 2019
    • Exploration expenditure uplift rate
    • General expenditure uplift rate
    • LNG
  • 1 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Index Map
  • Pluto LNG Upstream Detail Map
  • Participation
  • Reserves (2P) at 01/01/2026
  • Production (2015-2024)
  • Production Profile
  • Exploration Costs 2015 to 2023 (US$ million)
  • Operating Costs 2024 to 2033 (US$ million)
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • 6 more item(s)...

What's included

This report contains:

  • Document

    Pluto LNG - upstream

    XLS 725.00 KB

  • Document

    Pluto LNG - upstream

    PDF 3.02 MB