Asset Report

PM6 (License expired)

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The PM6 PSC includes the Dulang and Resak fields. The Dulang oil field was developed by PETRONAS Carigali under a unitisation agreement with Exxon. The development incorporates four platforms, a floating storage and offloading system (FSO) and a subsea pipeline network. The Resak gas/condensate field was brought onstream in January 2000 with produced gas piped to Kerteh via a purpose-built pipeline.

Table of contents

  • Summary
  • Key Issues
  • Unitisation
    • Historical development (Phase 1)
    • Dulang re-development (Phase 2)
    • Upstream transfer price - Malaysia Reference Price (MRP)
  • Other Assumptions
  • Gas Price
  • Cash Flow

Tables and charts

This report includes the following images and tables:

    Index MapPM6 MapParticipation
    Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2004-2013)Production ProfilePlatform SummaryPlatform SummaryPipeline SummaryExploration Costs 1997 to 2005 (US$ million)
  • 9 more item(s)...

What's included

This report contains:

  • Document

    PM6 (License expired)

    XLS 983.00 KB

  • Document

    PM6

    PDF 2.07 MB