Po Valley Energy-operated fields
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Podere Maiar - key development metrics
- Teodorico - development concept
- Gas
- Capital costs
- Operating costs
- Gas
- Gas price
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Po Valley Energy-operated fields mapParticipation at key fieldsField hydrocarbon and reservoir quality
-
Discovery summaryReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2023-2024)Podere Mairar production profileCapital Costs 2017 to 2023 (US$ million)Operating Costs 2024 to 2033 (US$ million)Annual gas pricesCash Flow (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
PERTAMINA ASSET 4 - West Papua
This report covers the Pertamina EP (PEP)-operated Asset 4 areas in West Papua categorised under Pertamina's Zone 14.
$3,720Raul-Yuri Ervier
This analysis covers the im. R.-Y. Ervier field in Russia, operated through Eurotek-Yugra. Eurotek-Yugra was a JV between ...
$3,720Indefatigable (inc Inde SW)
This analysis includes the Perenco-operated Indefatigable West and Indefatigable Southwest (Inde SW).Indefatigable is located 90 ...
$3,720