Project Atlas
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Onshore PRRT
- Corporate Tax
- Royalty
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapReserves (2P) at 01/01/2026
-
Production (2018-2024)Production ProfilePipeline SummaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2034 (US$ million)East coast gas price assumptionSenex medium term contractCash Flow (US$)PV Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Hellyer Tailings zinc smelter project
A detailed analysis of the Hellyer Tailings zinc smelter project.
$2,250Luda Area
The Luda Area cluster in the Bohai bay comprises several heavy oil fields, Luda 10-1, 4-2, 5-2, 27-2, 21-1, 5-2N and 6-2 etc.
$3,720McArthur River zinc smelter project
A detailed analysis of the McArthur River zinc smelter project.
$2,250