Asset Report

McArthur River zinc smelter project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

With the expansion of the McArthur river mine allied to the potential for cheap energy sources, the option for a zinc smelter to process the additional concentrate appeared a good option. However the announcement that the bulk concentrate will be treated to make a saleable zinc concentrate means that a smelter at McArthur river is now extremely unlikely to happen. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Location / Transport
  • Conc. Receipt / Storage
  • Roaster
  • Acid Plant
  • Leach Plant
  • Purification
  • Tankhouse
  • Casting Plant
  • Residue Disposal
  • Other

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    McArthur River zinc smelter project

    PDF 1.10 MB