Project Atlas
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Onshore PRRT
- Corporate Tax
- Royalty
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapReserves (2P) at 01/01/2026
-
Production (2018-2024)Production ProfilePipeline SummaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2034 (US$ million)East coast gas price assumptionSenex medium term contractCash Flow (US$)PV Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Maroochydore copper mine project
A detailed analysis of the Maroochydore copper mine project.
$2,250Ravensthorpe Gold/Copper copper mine project
A detailed analysis of the Ravensthorpe Gold/Copper copper mine project.
$2,250SB H (LNG)
Rotan and three other gas fields in deepwater Sabah, operated by PTTEP, are developed to supply to PETRONAS'FLNG2
$6,900