Project Atlas
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Onshore PRRT
- Corporate Tax
- Royalty
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapReserves (2P) at 01/01/2027
-
Production (2018-2024)Production ProfilePipeline SummaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2034 (US$ million)East coast gas price assumptionSenex medium term contractCash Flow (US$)PV Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Namosi gold mine project
A detailed analysis of the Namosi gold mine project.
$2,250ETAP (BP)
The Eastern Trough Area Project (ETAP) was established to develop several oil and gas accumulations which were unlikely to prove ...
$5,280Bellevue mine
A detailed analysis of the Bellevue gold mine project.
$2,250