Puteri Cluster SFA
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Emissions
- Key Development Metrics
- Wells and Pipeline Summary
- Jadestone's 80% share of revenue to cover:
- Cash Flow
- Discount rate and date
- Inflation rate
- Oil price
- Indicative Technical Valuations
Tables and charts
This report includes the following images and tables:
- Index Map
- Detail Map
- Participation
- Reserves (2P) at 01/01/2025
- Production (2027-2036)
- Production Profile
- Capital Costs 2025 to Post-2033 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- 4 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Baram Junior Cluster SFA
Located in the Baram Delta basin offshore Sarawak, the Baram Junior Cluster consists of six fields and will come onstream in 2027.
$3,720Meranti Cluster DRO
The Meranti Cluster SFA PSC comprises the Meranti, Kapal, Merpauh, and Ipoh fields, and is being positioned for a low-cost development.
$3,720Qineng (Aluminium) aluminium smelter
As the largest smelters in Chongqing, Qineng smelter was designed to 330 ktpa aluminium capacity with 2×330MW captive power plant.
$2,250