Q2 2018 pre-FID upstream project tracker: Mideast FIDs ramp up
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Q2 2026 pre-FID project tracker: FPSO projects dominate the quarter’s committed investment
Our Q2 2026 outlook for global pre-FID upstream projects.
$6,750Balingian
The Balingian PSC contains several shallow-water oil and gas fields offshore Sarawak, and is operated by Petronas Carigali.
$3,720Grane Oil Pipeline
The Grane Oil Pipeline runs 220 kilometres from the Grane platform to the Sture terminal.
$2,580