Rapak and Ganal (IDD) (LNG)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Unitisation
- Seismic
- Exploration Drilling
- Rapak PSC
- Ganal PSC
- Rapak PSC
- Ganal PSC
-
Rapak PSC
- Bangka/Aton
- Ganal PSC
- Emissions
-
Historical development plans
- Indonesia Deepwater Development (IDD)
-
Key development metrics
- Bangka/Aton
- Historical development
- Exploration costs
-
Capital costs
- Bangka/Aton
- Gendalo, Gandang, Gehem, Geliga and Gula
- Bontang Costs
- Gehem
- Gendalo
- Gandang
- Geliga and Gula
- 5 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2028-2037)Ganal PSC Production ProfilePipeline SummaryExploration Costs 2018 to 2026 (US$ million)Cash Flow (US$)
- 30 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Makassar (IDD) (LNG) (Ceased Production)
Makassar is a deepwater PSC offshore East Kalimantan which includes the West Seno, Merah Besar and South Seno fields.
$3,720West Ganal (Maha) (LNG)
The West Ganal PSC was originally carved out of the Makassar PSC. It covers an area of 1,129 km2 and is adjacent to the Jangkrik and ...
$3,720Indonesia upstream summary
Southeast Asia's largest oil and gas producer, with steady gas production offsetting declining liquid output.
$11,340