Reindeer (Ceased)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Wells
- Platform summary
- Facilities
- Contractors
- Exploration Costs
- Development Costs
- Operating Costs
- Alcoa
- CITIC Pacific
- Rio Tinto
- Murrin Murrin
- PRRT
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapReindeer Detail MapParticipation
-
Reserves (2P) at 01/01/2026Production (2015-2024)Production ProfileExploration Costs 2002 to 2008 (US$ million)Capital Costs Pre-2012 to 2020 (US$ million)Operating Costs 2016 to 2024 (US$ million)Alcoa contractsCITIC Pacific contract
- 9 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Lancelot Area
The Lancelot Area in the Southern Gas Basin, lies 30-kilometres south of the West Sole Area. This group includes the Lancelot, ...
$3,720York
York is a small gas field 35 kilometres northeast of the Easington terminal. Production ceased in July 2024.York was brought onstream ...
$3,720Abydos iron ore mine
Abydos is a small, open-cut iron ore mine, located in Western Australia. Reserves are now depleted and the mine closed at the end of 2017.
$2,250