RL 3 (LNG) - Upstream
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Geological framework
- Reservoir
- Gas quality
- Emissions
-
Initial Development (2004 to 2010)
- Wells
- Platform summary
- Supplier information
-
North Field Production Sustainability (2019 to 2032)
- Phase 1 - Investment 1 Project 1 (I1P1) (2019 to 2024):
- Phase 2 - EPC for Offshore and Pipelines (EPCOL) (2022 to 2025):
- Phase 3 - Compression (COMP) (2022 to 2032):
-
Onshore infrastructure
- Liquefaction plant development
- Gas processing and liquefaction
- Common Lean LNG Facility (CLLNG)
- Common Condensate Storage and Loading Facility (CCSL)
- Common LPG Facility (CLPG)
- Common Sulphur Facility (CSF)
-
Further Developments
- Jetty boil-off gas recovery project (JBOG)
- Helium projects
- Barzan Connection
- LNG Shipping
-
Capital Costs
- North Field Production Sustainability
- Operating costs
- South Korea
- Taiwan
- India
- Bangladesh
- China
- Atlantic basin contracts and flexible volumes
- Cash Flow
-
Liquids price
- Condensate
- LPG price
-
LNG price
- Contracts
- Flexible Asia volumes
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining PV Price SensitivitiesReservoir CharacteristicsReserves (2P) at 01/01/2026
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Qatargas 3 (LNG) - upstream
Qatargas-3 is a fully integrated North Field LNG project. It was developed jointly with Qatargas-4, and both projects include identical ...
$3,720RasGas II (LNG) - Upstream
RasGas II is an integrated North Field LNG project. The LNG plant consists of three 4.7 mmtpa trains (Trains 3, 4 & 5). Train 3 ...
$3,720Ichthys LNG - upstream
Ichthys is a giant gas-condensate field that was brought onstream in 2018 via an integrated LNG development.
$6,900