S-1 and Vashishta
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Location
- Source Rocks
- Exploration costs
- Capital costs
-
Operating costs
- Price revision
- Cash flow
- Gas price
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- Detail Map
- Participation
- Exploration Costs 2016 to 2024 (US$ million)
- Capital Costs Pre-2016 to 2024 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
PM304
The Petrofac-operated Block PM304 is located offshore Peninsular Malaysia, on the western flank of the Malay Basin, and contains the ...
$3,720Subsurface and Licensing in brief
Rolling coverage and analysis of key E&A activity, licensing, breakthrough technologies, and other subsurface events.
$1,300Block 15-1/5 (Lac Da Vang)
Block 15-1/5 in the Cuu Long basin is Murphy Oil's first development in Vietnam. Lac Da Vang will be the first field to be developed.
$3,720