Asset Report

Sampang

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Sampang PSC is located offshore East Java around 60 kilometres from Surabaya. The block contains five fields - Anggur, Oyong, Jeruk, Wortel, and Paus Biru - of which only the Oyong and Wortel fields are onstream. Gas is supplied to the Grati power plant operated by PT PLN subsidiary PT Indonesia Power. Oil production ceased in 2017. Ophir Energy discovered the Paus Biru gas field in December 2018. In May 2019, Medco completed its acquisition of Ophir Energy and took over the operatorship of the Sampang PSC. Approved in 2020, the Paus Biru Plan of Development (POD) includes a single horizontal well and a tripod wellhead platform tied back to the Oyong facilities by a 27 km pipeline.

Table of contents

Tables and charts

This report includes the following images and tables:

  • Index Map
  • Detail Map
  • Participation
  • Pipeline Summary
  • Exploration Costs 2017 to 2025 (US$ million)
  • Operating Costs 2024 to 2033 (US$ million)
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
  • 10 more item(s)...

What's included

This report contains:

  • Document

    Sampang

    XLS 885.50 KB

  • Document

    Sampang

    PDF 2.13 MB