South Arne
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- 
        
            Key Issues
        
        - Potential for further infill drilling
- First production achieved from the Solsort field via South Arne
- Hejre field tie-back offers upside
- Upside through gas blowdown
- Initial production performance being alleviated through reinjection
- Danish carbon tax set to be introduced in 2025
 
- Unitisation
- Emissions
- 
        
            South Arne Phase II
        
        - Platforms
- Wells
- Future development assumptions
 
- Capital costs
- Decommissioning costs
- 
        
            Operating costs
        
        - Emissions taxes
- Tariff Receipts
 
- Cash flow
- Global Economic Model (GEM) File
- Cash Flow
- Cash flow (US$ million)
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
- Participation
- Field characteristics
- Reserves (2P) at 01/01/2026
- Production (2014-2023)
- Production profile
- Capital Costs Pre-2015 to 2023 ( million)
- Capital Costs 2046 to 2048 ( million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- Split of Revenues
- 13 more item(s)...
What's included
This report contains:
Other reports you may be interested in
S Arne-Nybro Terminal Gas Pipeline
The South Arne-Nybro pipeline runs from the offshore South Arne platform via the Harald facilities to the Nybro gas terminal in ...
$5,280Solsort
Solsort is a small oil field located to the northeast of South Arne in the eastern part of the Danish offshore sector. The field was ...
$3,720Tyra East-Nybro Terminal Gas Pipeline
The Tyra East-Nybro Terminal Gas Pipeline is the main gas trunkline which links all the gas producing fields on the Danish shelf (with ...
$2,580 
         
         
         
         
         
         
     
     
     
     
     
     
     
     
    