Country Report

Sudan upstream summary

Get this report

$5,400

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Sudan retained control of two developments after South Sudan became independent in 2011. These were Block 6 and the northern part of the Greater Nile Oil Project. Both are located in the Muglad-Sudd Rift Basin, 750 kilometres south of Khartoum. In 2013, the Block 17 development also came onstream. Most fields in Sudan are maturing, and production is in gradual decline. Sudan ceded control of the Melut Basin Oil Project, the southern part of the Greater Nile Oil Project (GNOP) and the Block ...

Table of contents

  • Executive summary
  • Key facts
  • Location maps
  • Key companies
    • Introduction
    • Muglad - Sudd Rift Basin
    • Melut Rift Basin
    • Red Sea Basin
    • Licensing
    • Drilling
      • Drilling activity
    • Gas Reserves
    • Oil/Liquids
    • Introduction
    • Oil infrastructure
      • Export Oil Pipelines
      • Terminals
      • Refining
    • Capital costs
      • Capital expenditure by location
    • Operating costs
      • Operating expenditure by location
    • Key legislation
    • Regulatory body
    • State oil company
    • State participation
    • Licensing
      • Duration
      • Commitments
      • Relinquishment
      • Rentals
    • Overview
      • Upstream
      • Mid/Downstream
    • Current fiscal terms
    • Production sharing contracts
    • NOC equity participation
      • Participation rate
      • Carry & reimbursement
      • Bonuses and fees
    • Indirect taxes
    • Royalty and other production taxes
    • Product pricing
    • PSC cost recovery
    • PSC profit sharing
    • Corporate (or Petroleum) income tax
    • Historical background
      • Pre-1980s
      • 1980s
      • 1990s - 2000s

Tables and charts

This report includes 24 images and tables including:

  • Key facts: Table 1
  • Country map
  • Reserves and contingent resources at 01/01/2024
  • Liquids and Gas Production 2024
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Sudanese Basins map
  • Stratigraphic column of the Muglad - Sudd Rift Basin
  • Sudan licence map
  • Exploration: Table 1
  • Production: Table 1
  • Production: Table 2
  • Liquids production
  • Sudanese oil infrastructure map
  • Fiscal terms: Table 2
  • Fiscal terms: Table 3
  • Exploration drilling in Sudan
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Fiscal terms: Table 1
  • GEM models

What's included

This report contains:

  • Document

    Country Overview

    PDF 10.27 MB

  • Document

    Country Overview

    XLS 650.50 KB