Asset Report

Surat Gas Project (Arrow)

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Surat Gas Project is a coal seam gas development in the Surat Basin, southeast Queensland. The project is operated by Arrow Energy, a joint venture between Shell (50%) and PetroChina (50%). Production from the Kogan, Tipton West and Daandine fields started in the early 2000s. In April 2020 the first phase of the Surat Gas Project was sanctioned. This phase will require between 700 and 800 wells, delivering up to 250 mmcfd to QCLNG. There is potential for a further four additional phases that could produce around 685 mmcfd (4.4 mmtpa) at peak.

Table of contents

  • Summary
    • QCLNG GSA
    • Domestic gas
    • Legacy production
    • Development plan
    • Well design
    • Timeline
    • Number of wells modelled
    • Well performance (EUR) assumed
    • Average water production per well modelled
  • Ongoing capex
    • QCLNG GSA
    • Legacy domestic gas contracts
    • Kogan
    • Tipton
    • Daandine
    • Corporate income tax
  • Cash flow
  • Cash Flow

Tables and charts

This report includes the following images and tables:

    Index MapDetail MapParticipation
    Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Capital Costs Pre-2017 to 2025 (US$ million)Operating Costs 2026 to 2035 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
  • 9 more item(s)...

What's included

This report contains:

  • Document

    Surat Gas Project (Arrow)

    XLS 3.23 MB

  • Document

    Surat Gas Project (Arrow)

    PDF 2.08 MB