Tambaredjo Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Exploration goals, horizontal drilling, and increasing reserves
- Structure and source
- Reservoirs
- Tambaredjo
- Calcutta
- Other fields
-
Exploration in the Tambaredjo and Calcutta area
- Tambaredjo
- Calcutta
- Near-field exploration
- Other exploration areas
-
Tambaredjo
- Facilities
- Enhanced oil recovery
- Water cut
-
Calcutta
- Facilities
-
Tambaredjo Northwest
- Facilities
- Wells
- Exploration costs
- Capital costs
-
Operating costs
- Transportation
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)
-
Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining PV Price Sensitivities
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Contract 1 Area (Ceased)
The contract 1 Area, previously known as the Unocal 1 Contract Area, was the first offshore gas project in the Gulf of Thailand. ...
$3,720Marlim and Voador Area
The giant Marlim oil field was developed as a high priority asset for Petrobras. It was the largest field in terms of reserves until ...
$3,720Shurtan Area
State-owned Uzbekneftegaz (UNG) operates the Shurtan Area, which is centred on the giant, albeit mature, Shurtan gas field and related ...
$3,720