Asset report

Thunder Hawk (MC 734)

From

$1,700.00

Get this report

From

$1,700.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Thunder Hawk (MC 734) is an oil field located in southern Mississippi Canyon just 6 kilometres (3.5 miles) to the northeast of BP's Thunder Horse. Thunder Hawk has been developed on a standalone basis using a dedicated third party owned semi submersible production facility. The deep draft semi submersible hub used for the Thunder Hawk development was leased to the joint venture by SBM Offshore. The agreement gave the field's owners access to the facility's capacity for an ...

What's included

This report contains

  • Document

    Thunder Hawk (MC 734)

    PDF 3.07 MB

  • Document

    Thunder Hawk (MC 734)

    XLS 240.50 KB

  • Document

    Thunder Hawk (MC 734)

    ZIP 3.23 MB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Production
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 13 images and tables including:

Images

  • Index Map
  • Field Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining PV Price Sensitivities

Tables

  • Key facts: Table 1
  • Production: Table 1
  • Production: Table 2
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3

You may be interested in

Asset report

Ram-Powell (VK 912)

Asset report

Pikka Unit

Asset report

Chevron Alberta

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898