Asset Report

Tin Fouye-Tabankort

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

15 August 2018

Tin Fouye-Tabankort

Report summary

The Tin Fouye-Tabankort (TFT) field is one of the largest IOC operated gas fields in Algeria and is located in the prolific Illizi-Ghadames basin. The field was originally developed as an oil field with production from the large oil leg beneath the gas cap. Total and Repsol were awarded a production licence in 1996 as part of Sonatrach's strategy to develop the gas sector and TFT was a key early project in developing Algeria's LPG and condensate production. The Groupement TFT partners commenced wet gas production from the TFT field in March 1999.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Reserves and resources
  • Production
    • Early Development
    • Groupement TFT Development
  • Infrastructure
    • Capital Costs
    • Operating Costs
  • Sales contracts
    • Tin Fouye-Tabankort PSC
    • Windfall Tax
    • Tin Fouye-Tanbankort Concession
    • State equity
    • Fiscal Zones
    • Area Tax
    • Royalty
    • Petroleum Revenue Tax
    • Corporate Income Tax (ICR)
    • Environmental / CO2 taxes
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas Price
    • Global Economic Model (GEM) file
    • Cash Flow
      • Tin Fouye-Tabankort
    • Cash Flow

Tables and charts

This report includes 36 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Tin Fouye-Tabankort Map
  • Participation: Table 1
  • Participation: Table 2
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Pre 2019 Production Profile
  • Post 2018 Production Profile
  • Infrastructure: Table 1
  • Sales contracts: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Fiscal and regulatory: Table 3
  • Fiscal and regulatory: Table 4
  • Tin Fouye-Tabankort (post 2019)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2019)
  • Economic analysis: Table 7
  • Remaining PV Price Sensitivities
  • Economic analysis: Table 1
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Remaining Present Value Price Sensitivities

What's included

This report contains:

  • Document

    Tin Fouye-Tabankort

    PDF 6.50 MB

  • Document

    Tin Fouye-Tabankort

    XLS 636.00 KB

  • Document

    Tin Fouye-Tabankort

    ZIP 6.44 MB