Asset Report

Tin Fouye-Tabankort

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Tin Fouye-Tabankort (TFT) field is one of the largest IOC operated gas fields in Algeria and is located in the prolific Illizi-Ghadames basin. The field was originally developed as an oil field with production from the large oil leg beneath the gas cap. Total and Repsol were awarded a production licence in 1996 as part of Sonatrach's strategy to develop the gas sector and TFT was a key early project in developing Algeria's LPG and condensate production. The Groupement TFT partners commenced wet gas production from the TFT field in March 1999.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Reserves and resources
    • Emissions
    • Groupement TFT Development
      • TFT
      • TFT ll
    • TFT Sud
  • Infrastructure
    • Capital Costs
    • Operating Costs
  • Sales contracts
  • 3 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index map
  • Tin Fouye-Tabankort map
  • Participation: Table 1
  • Participation: Table 2
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • TFT (pre 2019) production profile
  • TFT (2019-2023) production profile
  • 20 more item(s)...

What's included

This report contains:

  • Document

    Tin Fouye-Tabankort

    PDF 6.64 MB