Asset Report

Tolmount

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Tolmount lies in the Southern Gas Basin, 46 kilometres northeast of the Easington terminal. E.ON made the discovery in 2011. Harbour Energy and partner Dana Petroleum took FID in 2018.The field was developed with a normally unmanned installation (NUI) and four platform wells. The wells were drilled ahead of start-up at Tolmount. Results from the third well revealed a shallower gas-water contact than expected and the field reserves were substantially downgraded from initial estimates of 500 ...

Table of contents

  • Summary
    • Additional tie-backs required to delay decommissioning
    • Harbour Energy considers UK portfolio rationalisation
    • Tolmount
  • Decommissioning costs
  • Operating costs
  • Cash flow
  • Global Economic Model (GEM) file
  • Cash Flow
  • Cash flow (US$ million)
  • Cash flow (£ million)
  • Indicative Technical Valuations

Tables and charts

This report includes the following images and tables:

  • Capital Costs 2031 to 2033 (£ million)
  • Operating Costs 2022 to 2030 (£ million)
  • Annual gas prices
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • Cash Flow (Local Currency)
  • PV Table (Local Currency)
  • Summary Table (Local Currency)
  • Index map
  • Tolmount
  • Participation
  • 8 more item(s)...

What's included

This report contains:

  • Document

    Tolmount

    XLS 981.00 KB

  • Document

    Tolmount

    PDF 2.70 MB