Asset Report

Tortue (Mauritania)

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Greater Tortue Ahmeyim (GTA) project is a cross-border deepwater gas development, 120 kilometres from shore. The project is split equally between Senegal and Mauritania. It was discovered in 2015 and is being developed in a phased manner with a floating LNG solution. The first phase will include four production wells located in over 2,700 metres water depth, tied-back to a shallow-water floating production, storage and offloading (FPSO) vessel. Condensate will be processed and exported ...

Table of contents

  • Summary
    • Phase 1
    • Phase 2
    • Phase 1 and Phase 1+
    • Phase 2
  • Exploration costs
  • Capital costs
    • Phase 1 and Phase 1+
    • Phase 2
  • Cash flow
  • Gas price
  • Global Economic Model (GEM) Files
  • Cash flow
  • Phase 1 (Mauritania)
  • Phase 2 (Mauritania)
  • Indicative Technical Valuations

Tables and charts

This report includes the following images and tables:

    Index MapDetail MapGreater Tortue Ahmeyim (Mauritania) participation
    Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Capital Costs Pre-2017 to 2025 (US$ million)Operating Costs 2025 to 2032 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
  • 14 more item(s)...

What's included

This report contains:

  • Document

    Tortue (Mauritania)

    PDF 2.62 MB