TotalEnergies WGT hub
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
Unitisation
- J/3a
- K/1a
- K/4b-K/5a
- K/4a
- K/5b
- J/3a
- K/4b-K/5a
- K/4a
- K/2c & K/5b
-
Key development metrics
- J/3a
- K/4b-K/5a
- K/4a
- K/5b
- K/4b-K/5a
- K/4a
-
Capital costs
- J/3a
- K/1a and K/4-Z
- K/4b-K/5a
- K/4a
- K/5b
-
Operating costs
- J/3a
- K/1a and K/4-Z
- K/4b-K/5a
- K/4a
- K/5b
- 10 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index mapTotalEnergies WGT hub mapHydrocarbon quality
-
Reservoir qualityDiscovery summaryReserves (2P) at 01/01/2026Production (2014-2023)J/3a production profileK/1a production profileK/4-Z production profileK/4b-K/5a production profileK/4a production profile
- 50 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Seagull
The Seagull high pressure/high temperature (HP/HT) field lies in the Central North Sea, 17 kilometres south of the ETAP (BP) Central ...
$3,720Frostpipe
The Frostpipe was constructed to transport condensate and oil from the Lille Frigg and Frøy fields to the Oseberg field.
$2,580ETAP (BP)
The Eastern Trough Area Project (ETAP) was established to develop several oil and gas accumulations which were unlikely to prove ...
$5,280